KITCHEN RENOVATION COST / BUDGET GUIDE
What does a kitchenrenovation cost?
The honest answer depends on what you keep, what you replace and where the work takes place. Use this guide to build a scope-based budget instead of relying on a misleading universal average.
AI concepts and material quantities are provisional. Validate all site dimensions and safety-critical work.

Kitchen renovation costs depend on the size of the room, but size alone is a poor predictor. A compact kitchen with relocated plumbing, custom cabinets and expensive appliances may cost more than a larger kitchen where the existing layout stays. A realistic budget starts with the actual scope of work—and the parts you do not need to replace.
Three kitchen budgets that should never be confused
| Project type | Typical scope | Biggest uncertainty |
|---|---|---|
| Cosmetic kitchen refresh | Paint suitable cabinet fronts, replace handles, update some lighting and decorative finishes | Surface preparation and underlying cabinet condition |
| Partial kitchen renovation | Selected cabinet fronts, new worktop or backsplash, targeted appliance or flooring updates | Compatibility with existing plumbing, power and dimensions |
| Complete kitchen renovation | Cabinet replacement, new appliances, services, surfaces, potential layout changes | Labor, concealed defects, trade sequencing and cabinetry specifications |
Quotes should state exactly what is included. Two contractors can appear to offer different prices for the “same kitchen” while one includes disposal, electrical changes and finishing details and the other does not.

A practical kitchen renovation cost worksheet
Break the project into packages before asking for prices. Capture a materials estimate, installation estimate, supplier and scope notes for each package. This is more useful than multiplying floor area by a generic figure.
| Budget line | What to include |
|---|---|
| Preparation and removal | Protection, disconnection by qualified trades where needed, cabinet removal and disposal |
| Cabinets and hardware | Carcasses or fronts, hinges, drawer runners, handles, installation and adjustments |
| Worktops and splashbacks | Material, measurements, edge treatment, cuts, adhesive, grout, trim and fitting |
| Appliances | Exact models, delivery, connections, ventilation and any compatible cabinetry |
| Services and lighting | Electrical, plumbing, ventilation, testing and local compliance |
| Flooring and decoration | Surface preparation, flooring, transitions, painting and trims |
| Labor and contingency | Professional installation and a reserve for unknown conditions or changes |
Worked example: estimating a kitchen splashback
Suppose your measured splashback area is 4.8 m². If the chosen tile layout and product justify an illustrative 10% cutting allowance, the provisional tile quantity becomes 4.8 × 1.10 = 5.28 m², before rounding to full packs and checking the installer's requirements. That is a materials quantity example—not a claim about labor cost or the correct allowance for every pattern.
For cabinetry, a similarly useful method is to count each door, drawer and end panel, then cost the preparation and finishing system or replacement fronts. For worktops, measure the actual runs, seams, cut-outs and required supports; a simple surface-area calculation may miss important fabrication costs.
What tends to make kitchen renovation costs rise?
Moving the sink or cooking zone
New pipe routes, ventilation and electrical requirements can trigger additional trades and finishing work. First compare a scheme that preserves service locations.
Custom cabinetry and specialist worktops
Bespoke dimensions, complex corners, large slabs, special edge profiles and extensive cut-outs add fabrication and fitting complexity.
Unexpected conditions
Water damage, uneven walls, inadequate circuits and obsolete plumbing can change the specification. Assess these early where possible, and hold an appropriate contingency rather than presenting estimates as guaranteed totals.
Local labor and materials
Costs vary across cities and countries. The same article should not advertise US averages as if they also applied in France, Germany or Brazil. We will add market-specific price tables only when supported by current local evidence.
Five questions to ask before accepting a quote
- Does the quote include all removal, disposal and making-good work?
- Which product brands, dimensions, finishes and installation systems are specified?
- What electrical, plumbing or ventilation work is excluded?
- What happens if unexpected substrate damage or service defects appear?
- What are the lead times, payment stages, inspection responsibilities and warranties?
The broader kitchen renovation guide helps decide scope. For more visual direction, explore the kitchen inspiration gallery or test an AI kitchen design before refining your materials list.