Renovation decisions are easier when you separate what looks good from what fits the room, the building and the budget. This guide provides a practical framework you can adapt to your project. Prices and technical requirements vary by location and specification.
1–3. Layout mistakes
1. Moving everything without a reason
Moving a sink, hob or extractor can create extra plumbing, electrical and ventilation work. Draw a keep-the-services option before committing to a complete relocation.
2. Designing around a single pretty photo
Use reference photos for finishes, not as proof that a plan will fit. Check walkway clearance, door swings, drawers that collide, and whether two people can use the kitchen at once.
3. Forgetting appliance opening space
A dishwasher door, fridge door or oven may block a route or cabinet. Mark the fully opened footprint on a measured floor plan.
4–6. Technical mistakes
4. Ignoring extraction
An attractive canopy is useless if its duct route, capacity, noise and local requirements are not considered. Verify the manufacturer's installation guidance.
5. Adding sockets too late
List every fixed and countertop appliance before a qualified electrician finalizes the circuit and outlet plan. Do not assume an existing circuit can safely support new loads.
6. Choosing finishes before checking moisture and substrate
Uneven floors, damp walls or damaged backing need treatment before installing a new splashback or floor. Covering defects usually makes the remedy more expensive later.
7–8. Sequencing mistakes
7. Ordering cabinets before final measurements
Measure after demolition where necessary. Walls may be out of square; check appliance specifications, filler strips, worktop overhang and service clearance.
8. Scheduling trades in the wrong order
Typical sequence: survey, design and procurement, safe isolation, demolition, rough-in work, substrate repair, finishes, installation, connections and testing. Dependencies change by project.
9–10. Budget and quality mistakes
9. Comparing quotes by their headline total
Compare who supplies appliances, who removes waste, what 'installation' includes, and how variations are approved. A cheaper quote missing major items can become the most expensive.
10. Spending the entire budget before opening the walls
Keep a contingency appropriate to building age and uncertainty. Record what is optional so you can reduce scope without compromising safety or essential functionality.
A 15-minute pre-order checklist
- Photograph existing plumbing, electrical outlets and ventilation.
- Measure every wall in several positions.
- Confirm all appliance models and their installation clearances.
- Mark each cabinet door and drawer swing.
- Check flooring height changes and thresholds.
- Get at least one full, itemized installed quote.
- Document who signs off each technical stage.
To turn the checklist into a budget, read kitchen renovation costs, then explore AI kitchen concepts before ordering materials.
Turn the research into a room-specific plan
Start with a photo of your room, compare design directions and create provisional materials and work steps. Check measurements, trades and supplier prices before buying.
Start in Archicova chat ↗Sources & further reading
Links to primary guidance and independent demonstrations used in this article.
More renovation guides in the Archicova Edito. Explore kitchen renovation or bathroom renovation.